Violation Detail
Standard Cited: 19101200 E01 Hazard Communication.
Inspection Nr: 1058846.015
Citation: 01007
Citation Type: Serious
Abatement Date: 10/15/2015 2
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 08/14/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 09/03/2015
Emphasis:
Substance: 0440
Substance: 1040
Substance: 1377
Substance: 2460
Substance: 2590
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/03/2015 | $1,400.00 | 10/15/2015 | Serious | |
Penalty | Z: Issued | 08/14/2015 | $2,800.00 | 09/18/2015 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: Spray room, 425 St James Ave, Springfield MA: On or about 4/28/15, the employer did not develop, implement, and/or maintain at the workplace a written hazard communication program for hazardous materials such as, but not limited to, Shop-Line JH301 Undercoat Hardener, used for refinishing ambulances. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).