Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1044716.015
Citation: 01007
Citation Type: Serious
Abatement Status:
Initial Penalty: $2,000.00
Current Penalty: $0.00
Issuance Date: 08/28/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 09/22/2015
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 09/18/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/18/2015 | $0.00 | 09/22/2015 | Serious | |
Penalty | Z: Issued | 08/28/2015 | $2,000.00 | 09/22/2015 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) Sawmill - On or about March 6, 2015 the employer did not conduct a periodic inspection of its energy control procedure as required.