Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1010442.015
Citation: 01006I
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 04/01/2015
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/06/2016
Gravity: 10
Report ID: 0213100
Contest Date: 04/23/2015
Final Order: 01/06/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 01/06/2016 | $0.00 | 06/06/2016 | Serious | |
| Penalty | C: Contested | 05/07/2015 | $2,800.00 | 06/05/2015 | Serious | |
| Penalty | Z: Issued | 04/01/2015 | $2,800.00 | 06/05/2015 | Serious |
Text For Citation: 01 Item/Group: 006I Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer had not established written procedures to maintain the on-going integrity of process equipment used to manufacture the resin such as the two pressure vessels, the steam, water and vacuum piping including the valves, the relief system on the Weil Mclain boiler, the emergency shutdown switches for the boiler, the manual steam gauges located on the boiler and in the processing area and the two Kinney vacuum pumps. The employer is covered under 1910.119 because more than 1,000 lbs of formaldehyde were observed in storage on the first floor of the building on October 3, 2014.