Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 329260.015
Citation: 01006D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/18/2012
Nr Instances: 8
Nr Exposed: 29
Abatement Date: 10/02/2012
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 10/08/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/08/2012 | $0.00 | 10/02/2012 | Serious | |
| Penalty | Z: Issued | 09/18/2012 | $0.00 | 10/02/2012 | Serious |
Text For Citation: 01 Item/Group: 006D Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices (RAGAGEP): In Area 1 of the VCM unit: The employer did not comply with RAGAGEP by failing to provide adequate controls to ensure that intervening stop valves on the upstream and downstream lines to/from the following pressure relief devices (PRDs) remained in the open position during operation when a pressure vessel was the possible source of a relieving event, per UG-135(d) and Appendix M of the 2007 ASME Boiler & Pressure Vessel Code VIII, Division 1 - Rules for Construction of Pressure Vessels: 1. PSV-E7101A-D, PSE-E7101A-C; 2. PSV-E7104A; 3. PSV-E7106A-A; 4. PSV-T7103A-B, PSE-T7103A-B, PSV-T7103A-A, PSE-T7103A-A; 5. PSV-V7108A-A, PSE-V7108A-A; 6. PSV-E7102B-C, PSE- E7102B-C; 7. PSE-V7105A-A, PSE-V7105A-B; 8. PSE-V7106A-A, PSE-V7106A-B. This violation was documented on or about 03/22/2012.