Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1201163.015
Citation: 01006D
Citation Type: Other
Abatement Date: 06/10/2017 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/11/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0524500
Contest Date:
Final Order: 05/08/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/08/2017 | $0.00 | 06/10/2017 | Other | |
Penalty | Z: Issued | 04/11/2017 | $0.00 | 05/10/2017 | Serious |
Text For Citation: 01 Item/Group: 006D Hazard:
29 CFR 1910.184(e)(3)(i): A thorough periodic inspection of alloy steel chain slings was not made on a regular basis and/or were done at intervals greater than once every 12 months: On or about January 24, 2017, employees used chain slings in the Vertical Assembly Area of the Blending Department and the employer did not complete an inspection of the slings at least annually.