Violation Detail
Standard Cited: 19261101 J01 III Asbestos
Inspection Nr: 1002754.015
Citation: 01006C
Citation Type: Willful
Abatement Date: 05/23/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/20/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 10
Report ID: 0316700
Contest Date: 05/07/2015
Final Order: 07/08/2016
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/08/2016 | $0.00 | 05/23/2015 | Willful | |
Penalty | C: Contested | 05/20/2015 | $0.00 | 05/23/2015 | Willful | |
Penalty | Z: Issued | 04/20/2015 | $0.00 | 05/23/2015 | Willful |
Text For Citation: 01 Item/Group: 006C Hazard:
29 CFR 1926.1101(j)(1)(iii): The employer, which employees performing Class I asbestos work, does not develop or implement Decontamination Area Exit Procedures which meet the requirements of paragraphs A through E of this section: (a) First Capital Insulation, Incorporated - 1900 North 2nd Street, Harrisburg, PA - One instance of the employer's ongoing failure to comply with this standard occurred on or about October 21, 2014 when the employees removed their respirators while in the Dirty Room, the employees did not shower before entering the Clean Room, nor did the employees put on their street clothes on in the Clean Room. Abatement certification and documentation of this specific instance required within 10 days after abatement date. The certification shall include a statement that abatement of this specific instance is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement of this specific instance is complete, such as evidence of the purchase of equipment, photographic or video evidence of abatement or other written records.