Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1833122.015
Citation: 01006B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/12/2025
Nr Instances: 1
Nr Exposed: 55
Abatement Date: 03/30/2026
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 01/30/2026
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/30/2026 | $0.00 | 03/30/2026 | Serious | |
| Penalty | Z: Issued | 12/12/2025 | $0.00 | 01/09/2026 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. (a) On or about June 25, 2025, the employer did not conduct periodic inspections of their energy control procedures to ensure employees were protected from unexpected re-energization of equipment, and that lockout was used by employees performing servicing and maintenance tasks throughout the plant to include, but not limited to ammonia refrigeration equipment, process equipment, fermentation equipment, HTRT equipment, and Intake room equipment. Employees tasked with performing servicing and maintenance tasks were exposed to caught-in, crushing and amputation hazards, created by the energized machines and process.