Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1525407.015
Citation: 01006B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/11/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/20/2022
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 09/24/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 10/27/2021 | $0.00 | 01/20/2022 | Serious | |
Penalty | I: Informal Settlement | 09/24/2021 | $0.00 | 10/29/2021 | Serious | |
Penalty | Z: Issued | 08/11/2021 | $0.00 | 09/28/2021 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): Machine Shop: On, or about, May 6, 2021, point of operation safeguarding was not provided on the Dake hydraulic power press. The press was normally activated using a single lever that was located within reach of the point of operation.