Violation Detail
Standard Cited: 19100219 E03 I Mechanical power-transmission apparatus.
Inspection Nr: 1331625.015
Citation: 01006B
Citation Type: Serious
Abatement Date: 05/15/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/27/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 04/04/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/04/2019 | $0.00 | 05/15/2019 | Serious | |
Penalty | Z: Issued | 12/27/2018 | $0.00 | 01/24/2019 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a) Shop - On or about 07/16/18 and t times prior thereto employees operated the Johnson Notcher Machine #1. The belt and pulley system was not completely guarded/enclosed. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.