Violation Detail
Standard Cited: 19100184 E02 II Slings.
Inspection Nr: 1227576.015
Citation: 01006B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/13/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/25/2017
Gravity: 10
Report ID: 0215800
Contest Date: 10/30/2017
Final Order: 03/08/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/08/2018 | $0.00 | 10/25/2017 | Serious | |
Penalty | C: Contested | 11/02/2017 | $0.00 | 10/25/2017 | Serious | |
Penalty | Z: Issued | 10/13/2017 | $0.00 | 10/25/2017 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.184(e)(2)(ii): Makeshift link(s) or fastener(s) formed from bolts or rods, or other such attachment(s) on alloy steel chain sling(s) were being used: a) Maintenance Area, Weld Shop, on or about 4/27/17: A nut, bolt and washer was being used on an alloy steel chain sling. Abatement documentation must be submitted for this item.