Violation Detail
Standard Cited: 19260062 G01 II Lead
Inspection Nr: 1219220.015
Citation: 01006B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/11/2017
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 10/27/2017
Gravity: 10
Report ID: 0524200
Contest Date: 10/02/2017
Final Order: 04/05/2018
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/05/2018 | $0.00 | 10/27/2017 | Serious | |
Penalty | C: Contested | 10/05/2017 | $0.00 | 10/27/2017 | Serious | |
Penalty | Z: Issued | 09/11/2017 | $0.00 | 10/27/2017 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1926.62(g)(1)(ii): The employer did not provide, at no cost to the employee, and ensure the employee used appropriate protective work clothing and equipment that prevented contamination of the employee and the employee's garments, such as, but not limited to gloves, hat, and shoes or disposable shoe coverlets: W. Congress Pkwy and S. Jefferson St., Chicago, IL - Clausen Structures, Inc. did not ensure that employees used appropriate protective work clothing that prevented contamination of the employee and the employees' garments, such as, but not limited to shoes or disposable shoe coverlets. a) On or about March 15, 2017, employees performed air arcing and torch burning on a lead-coated steel bridge structure. Employees did not use disposable shoe coverlets while performing these activities. b) On March 29, 2017, an employee performed air arcing on a lead-coated steel bridge structure while a second employee assisted. Employees did not use disposable shoe coverlets while performing these activities. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.