Violation Detail
Standard Cited: 19100119 F01 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 494598.015
Citation: 01006A
Citation Type: Serious
Abatement Date: 01/10/2013 2
Initial Penalty: $4,900.00
Current Penalty: $4,900.00
Issuance Date: 12/20/2012
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 01/14/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/14/2013 | $4,900.00 | 01/10/2013 | Serious | |
Penalty | Z: Issued | 12/20/2012 | $4,900.00 | 01/10/2013 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.119(f)(1)(i)(D): The employer did not develop and implement written operating procedures that provide clear instructions for emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner. (a) The written operating procedures (Process Batch Sheets) for the processes containing greater than 10,000 pounds of flammable liquids including, but not limited to, the Unisol Liquid Red B Step 1 Coupler HBN process did not contain an emergency shutdown procedure and the conditions that would require an emergency shutdown as determined on July 18, 2012. ABATEMENT CERTIFICATION IS REQUIRED.