Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1806156.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $10,924.00
Current Penalty: $6,554.40
Issuance Date: 07/11/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 08/04/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/04/2025 | $6,554.40 | Serious | ||
Penalty | Z: Issued | 07/11/2025 | $10,924.00 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: On or about February 25, 2025, employees were exposed to fire and electric shock hazards and the employer did not ensure extension cords were not used in lieu of fix wiring to power lights and tools in the truss storage shelter.