Violation Detail
Standard Cited: 19100119 J06 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1511131.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,557.00
Current Penalty: $8,571.00
Issuance Date: 07/20/2021
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 10/12/2021
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 08/10/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 10/18/2021 | $8,571.00 | 10/12/2021 | Serious | |
Penalty | I: Informal Settlement | 08/10/2021 | $8,571.00 | 10/12/2021 | Serious | |
Penalty | Z: Issued | 07/20/2021 | $9,557.00 | 08/13/2021 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.119(j)(6)(ii):Appropriate checks and inspections were not performed to assure that equipment was installed properly and consistent with design specifications and the manufacturer's instructions. a) Chlorine Storage Building: The employer failed to assure checks and inspections were performed on the cylinder valve of the ton chlorine container prior to connecting the container to the mainfold as required by The Chlorine Institute Inc. Inspection Procedures, Chlorine Cylinder and Ton Container Valves for End Users, on or about 1/21/2021. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.