Violation Detail
Standard Cited: 19100303 G01 I A General.
Inspection Nr: 1381123.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,335.00
Current Penalty: $5,001.00
Issuance Date: 05/16/2019
Nr Instances: 2
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 06/04/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/04/2019 | $5,001.00 | Serious | ||
Penalty | Z: Issued | 05/16/2019 | $8,335.00 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: A. Fabrication Department: On, or about, March 7, 2019, a vertical support column for the underhung crane bridge was located 28 inch from the face of the Siemens panelboard that energized various equipment in the department. B. Test Area: On, or about, March 7, 2019, a compressed air hose reel stand had been installed in the working space for panelboard D-14.