Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1362873.015
Citation: 01006A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,273.00
Current Penalty: $1,363.80
Issuance Date: 03/20/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0418800
Contest Date:
Final Order: 04/01/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/01/2019 | $1,363.80 | Serious | ||
Penalty | Z: Issued | 03/20/2019 | $2,273.00 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.303(c)(3)(i): Conductors were not spliced or joined with splicing devices identified for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices were not first spliced or joined to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose: On or about 11/29/2018, jobsite located at 1230 NW 36th St. Miami, FL 33142, an air compressor had a splice on its cord covered with electrical plastic tape, exposing an employee to an electrical shock hazard.