Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1355961.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,304.00
Current Penalty: $3,000.00
Issuance Date: 03/11/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/21/2019
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 03/21/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/21/2019 | $3,000.00 | 03/21/2019 | Serious | |
| Penalty | Z: Issued | 03/11/2019 | $5,304.00 | 03/21/2019 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling. On October 26, 2018, employees were exposed to electrical shock hazards due to using a relocatable power tap not in accordance with instructions included in the listing or labeling.
Translate