Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1288430.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $4,979.70
Issuance Date: 06/20/2018
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 07/02/2018
Gravity: 10
Report ID: 0522300
Contest Date: 07/19/2018
Final Order: 02/01/2019
Related Event Code (REC):
Emphasis:
Substance: 8870
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/01/2019 | $4,979.70 | 07/02/2018 | Serious | |
Penalty | C: Contested | 07/24/2018 | $9,054.00 | 07/02/2018 | Serious | |
Penalty | Z: Issued | 06/20/2018 | $9,054.00 | 07/02/2018 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: On or about January 11, 2018, the employer did not ensure that the heater for the caustic tank had permanent wiring supplying power in lieu of an extension cord.