Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1081533.015
Citation: 01006A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 01/21/2016
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/07/2016
Gravity:
Report ID: 0626000
Contest Date:
Final Order: 03/08/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/08/2016 | $3,500.00 | 03/07/2016 | Other | |
Penalty | Z: Issued | 01/21/2016 | $7,000.00 | 03/07/2016 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.119(j)(2): The employer did not implement written procedures to maintain the on-going integrity of process equipment. This violation was most recently observed on or about July 23, 2015 in the engine room when the employer did not implement Mechanical Integrity procedure to ensure the insulation on process piping such as but not limited to -49 F Recirculator Outlet to Main Liquid Valve was repaired and sealed to prevent condensation and corrosion.