Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1050814.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,500.00
Current Penalty: $3,150.00
Issuance Date: 09/28/2015
Nr Instances: 3
Nr Exposed: 50
Abatement Date: 10/05/2015
Gravity: 5
Report ID: 0523100
Contest Date:
Final Order: 10/19/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2015 | $3,150.00 | 10/05/2015 | Serious | |
Penalty | Z: Issued | 09/28/2015 | $4,500.00 | 10/05/2015 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: (a) On or about March 31, 2015, in the fabrication shop, the employer failed to ensure the Miller arc welder, serial number JD727836 fittings were effectively closed. Employees were exposed to electrical hazards. (b) On or about March 31, 2015, in the fabrication shop, the employer failed to ensure the Lincoln Ideal Arc 500, serial number 859837 fittings were effectively closed. Employees were exposed to electrical hazards. (c) On or about March 31, 2015, in the fabrication shop, the employer failed to ensure Panel A transformer fittings were effectively closed. Employees were exposed to electrical hazards.