Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1040470.015
Citation: 01006A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,850.00
Current Penalty: $3,080.00
Issuance Date: 08/04/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/26/2015
Gravity: 5
Report ID: 0729700
Contest Date: 08/26/2015
Final Order: 10/27/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/27/2016 | $3,080.00 | 08/26/2015 | Serious | |
Penalty | C: Contested | 08/27/2015 | $3,850.00 | 08/26/2015 | Serious | |
Penalty | Z: Issued | 08/04/2015 | $3,850.00 | 08/26/2015 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.184(e)(3)(i): In addition to the inspection required by paragraph (d) of this section, a thorough periodic inspection of alloy steel chain slings in use were not made on a regular basis: Throughout the entire North Plant by the areas that service the Pressure Vessel Assembly (PVA) - Employees were exposed to struck-by hazards while operating suspended loads in that a periodic inspection of the alloy steel chain sling in use was not conducted for use with the hoists such as, but not limited to the following: (a) 10-ton capacity Stahl hoist (b) 5-ton capacity Acco-Wright hoist (c) 5-ton capacity Wright hoist (d) 7.5-ton capacity Acco-Wright hoist (e) 10-ton capacity Wright hoist (f) 20-ton capacity Acco-Wright hoist 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.