Violation Detail
Standard Cited: 19101200 H03 Hazard Communication.
Inspection Nr: 601618.015
Citation: 01006
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,600.00
Current Penalty: $7,000.00
Issuance Date: 02/15/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/01/2013
Gravity:
Report ID: 0729300
Contest Date: 03/05/2013
Final Order: 07/08/2013
Related Event Code (REC): A
Emphasis:
Substance: 0430
Substance: 1080
Substance: 1385
Substance: 2479
Substance: 2590
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 07/07/2013 | $7,000.00 | 04/01/2013 | Other | |
Penalty | C: Contested | 04/02/2013 | $5,600.00 | 04/01/2013 | Serious | |
Penalty | Z: Issued | 02/15/2013 | $5,600.00 | 04/01/2013 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.1200(h)(3): The employee training did not include the requirements of 29 CFR 1910.1200(h)(3)(i) through (h)(3)(iv): (Construction Reference: 1926.59) Location: The Boschertown Sanitary Sewer Project at or near 3400 N. Hwy 94, St. Charles, MO 63301. On or about August 23 through Aug 28, 2012, the employer did not provide adequate hazard communication training to employees involved in activities to include, but not limited to: a.) An employee solvent cleaning in six (6) confined spaces using Sherwin Williams, R6K10, Methyl Ethyl Ketone (2-Butanone, MEK) . b.) An employee painting in six (6) confined spaces using Sherwin Williams Macropoxy 646 Fast Curing Epoxy Part A (B58T604) and Part B (B58V600) that contained xylene, methyl isobutyl ketone (Hexone, MIBK), and ethyl benzene and thinned with Sherwin Williams, R6K10, Methyl Ethyl Ketone (2-Butanone, MEK). c.) An employee thinning/mixing paint using Sherwin Williams, R6K10, Methyl Ethyl Ketone (2-Butanone, MEK) and Sherwin Williams Macropoxy 646 Fast Curing Epoxy Part A (B58T604) and Part B (B58V600) that contained xylene, methyl isobutyl ketone (Hexone, MIBK), and ethyl benzene. d.) A Project Manager/Estimator evaluating a confined space job and ordering the 2-part epoxy paint for use in six (6) confined spaces.