Violation Detail
Standard Cited: 19260451 C01 General requirements.
Inspection Nr: 423123.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,000.00
Issuance Date: 10/29/2012
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 11/03/2012
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 11/15/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2012 | $3,000.00 | 11/03/2012 | Serious | |
Penalty | Z: Issued | 10/29/2012 | $7,000.00 | 11/03/2012 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) shall be shall have guying, tying, bracing, or equivalent means, as follows: a) Jobsite - 2000 Parrish Street - The tubular welded scaffold with a height to base ratio greater than four to one (4:1) was not restrained from tipping or collapse by guying, tying, or bracing. The scaffold was approximatley 32 feet in height and 5 feet in width. On or about April 30, 2012