Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 314345091
Citation: 01006
Citation Type: Serious
Abatement Date: 10/07/2010 X
Initial Penalty: $4,900.00
Current Penalty: $3,185.00
Issuance Date: 09/29/2010
Nr Instances: 3
Nr Exposed: 11
Related Event Code (REC):
Gravity: 10
Report ID: 0215800
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/12/2010 | $3,185.00 | 10/07/2010 | Serious | |
Penalty | Z: Issued | 09/29/2010 | $4,900.00 | 10/07/2010 | Serious |