Violation Detail
Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.
Inspection Nr: 311418057
Citation: 01006
Citation Type: Other
Abatement Status: X
Initial Penalty: $1,875.00
Current Penalty: $1,875.00
Issuance Date: 05/15/2009
Nr Instances: 6
Nr Exposed: 21
Abatement Date: 07/02/2009
Gravity: 03
Report ID: 0419400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/08/2009 | $1,875.00 | 07/02/2009 | Other | |
| Penalty | Z: Issued | 05/15/2009 | $1,875.00 | 07/02/2009 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard: REFINERY
29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity, did not follow recognized and generally accepted good engineering practices: (a)In Plant 81 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 8102-003-05 TML#3 showed an increase in piping wall thickness from .610 to .700 (90 Mils) from 01/05/00 to 07/22/04. (b)In Plant 16 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 0016-034-12 TML#9 showed an increase in piping wall thickness from .345 to .385 (40 Mils) from 12/04/00 to 12/22/003. (c)In Plant 81 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 8102-004-01 TML #6 showed an increase in piping wall thickness that was not resolved. (d)In Plant 81 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 8102-002-07 TML #1 showed an increase in piping wall thickness that was not resolved. (e)In Plant 81 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 8101-002-05 TML #13 showed an increase in piping wall thickness that was not resolved. (f)In Plant 81 of the facility: The employer did not resolve anomalous piping inspection data by ensuring that piping wall thickness data discrepancies were evaluated. During nondestructive evaluations using ultrasonic testing methods showed that piping section 8101-002-05 TML #8 showed an increase in piping wall thickness that was not resolved. API 570 Section 4.3.1 (c) Owner User Responsibilities regarding piping tests and inspections, corrective actions were not taken by the employer to resolve piping thickness data that indicates thickening pipes containing hydrocarbon products.