Violation Detail
Standard Cited: 19260701 B General requirements
Inspection Nr: 1854088.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,270.00
Current Penalty: $1,702.50
Issuance Date: 01/16/2026
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/12/2026
Gravity: 5
Report ID: 0728900
Contest Date:
Final Order: 01/29/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/29/2026 | $1,702.50 | 02/12/2026 | Serious | |
| Penalty | Z: Issued | 01/16/2026 | $2,270.00 | 02/12/2026 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.701(b):All protruding reinforcing steel, onto and/or into which employees could fall, was not guarded to eliminate the hazard of impalement: On or about October 3rd, 2025, employees engaged in demolition operations located at 1701 West Pleasant Hill Road, Lincoln, Nebraska 68523, were exposed to impalement hazards in that two steel rebar rods were protruding 2-4 inches in the upright position from a newly formed retaining wall. Employees were stepping over the retaining wall in order to perform work demolition work on the walls. The rebar was not equipped with protective caps.