Violation Detail
Standard Cited: 19100119 L01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1750423.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,524.00
Current Penalty: $5,762.00
Issuance Date: 11/06/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/30/2025
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 12/06/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 04/14/2025 | $5,762.00 | 06/30/2025 | Serious | |
| Penalty | I: Informal Settlement | 12/06/2024 | $5,762.00 | 05/06/2025 | Serious | |
| Penalty | Z: Issued | 11/06/2024 | $11,524.00 | 05/06/2025 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, procedures, and changes to facilities that affect a covered process: (a) On and before May 23, 2024, the employer did not implement procedures to manage changes to process chemicals, equipment, procedures, and changes to facilities that affect a covered process or mixture such that the technical basis for the proposed change and the impact of the change to safety and health of employees on the basis of Recognized and Generally Accepted Good Engineering Practices (RAGAGEPs) was evaluated. On or about May 23, 2024, the employer utilized a tank, P-7, within the batch room of the facility as the mixing and storage tank for a flammable liquid with a flash point below 100 �F in an amount exceeding 30,000 pounds.