Violation Detail
Standard Cited: 19100119 J04 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1744069.015
Citation: 01006
Citation Type: Other
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 10/18/2024
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 04/20/2026
Gravity: 10
Report ID: 0522500
Contest Date: 11/11/2024
Final Order: 10/20/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/20/2025 | $16,131.00 | 04/20/2026 | Other | |
| Penalty | C: Contested | 11/12/2024 | $16,131.00 | 11/07/2024 | Serious | |
| Penalty | Z: Issued | 10/18/2024 | $16,131.00 | 11/07/2024 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment shall be consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. a. On or about April 23, 2024, and at times prior, the employer did not ensure that mechanical integrity inspections were performed in accordance with the applicable manufacturers' recommendations and good engineering practices per ASME Code 31.3 - 2016 for Process Piping, regarding the CR1 covered process and the two-piece 1-inch compression fitting joint from the pipe assembly of the fluid feed piping into the CR1 reactor. As a result, there was a compression fitting failure that resulted in the separation of the piping on the CR1 Reactor that caught an ignition source, thereby exposing employees working on and in the vicinity of the CR1 covered process to contact, explosion and fire hazards.