Violation Detail
Standard Cited: 19261101 J02 Asbestos
This violation item has been deleted.
Inspection Nr: 1719781.015
Citation: 01006
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,524.00
Current Penalty: $0.00
Issuance Date: 04/24/2024
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 06/11/2024
Gravity: 5
Report ID: 0112000
Contest Date: 05/07/2024
Final Order: 09/20/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2024 | $0.00 | 06/11/2024 | Serious | |
Penalty | C: Contested | 05/10/2024 | $11,524.00 | 06/11/2024 | Serious | |
Penalty | Z: Issued | 04/24/2024 | $11,524.00 | 06/11/2024 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.1101(j)(2): The hygiene facilities and practices listed in sections (i) through (v) of this paragraph were not followed for employees performing Class I work involving less than 25 linear or 10 square feet of TSI or surfacing ACM and PACM, and for Class II and Class III asbestos work operations where exposures exceed a PEL or where there is no negative exposure assessment produced before the operation: Decommissioned Millstone Power Station Unit No. 1 Roof: On or about October 24, 2023, and sometime thereafter, the employer did not ensure that hygiene facilities and practices listed in sections (i) through (v) of this paragraph were followed for employees performing Class I work involving less than 25 linear or 10 square feet of TSI or surfacing ACM and PACM, and for Class II asbestos work operations where exposures exceed a PEL or where there is no negative exposure assessment produced before the operation. Hygiene facilities were unavailable for employees after they aggressively cut and removed lead-coated surfaces and structures containing thermal system insulation (TSI), surfacing material, and other insulation and material presumed to be asbestos containing material (PACM), including, but not limited to, auxiliary boiler systems; abandoned exhaust roof penetrations, water heating units, and HVAC gaskets in the following rooftop Millstone Power Station Unit 1 locations: a) Maintenance Shop Roof b) Turbine Building Roof c) Reactor Building Roof d) Yard - Radwaste & Radwaste Storage Roof