Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1718649.015
Citation: 01006
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,067.00
Current Penalty: $0.00
Issuance Date: 06/28/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/22/2024
Gravity: 5
Report ID: 0626700
Contest Date: 07/22/2024
Final Order: 01/29/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | D: Govt Dismissed | 01/29/2025 | $0.00 | 07/22/2024 | Serious | |
Penalty | C: Contested | 08/29/2024 | $8,067.00 | 07/22/2024 | Serious | |
Penalty | Z: Issued | 06/28/2024 | $8,067.00 | 07/22/2024 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
1910.107(b)(5)(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media. 29 CFR 1910.107(f)(3): Sprinklers protecting spraying areas were not kept as free from deposits as practical by cleaning daily if necessary: a) On January 11, 2024, in the Batch Building, the sprinklers in the big and small batch spray booths were not kept as free from deposits as practical.