Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1709579.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,839.00
Current Penalty: $3,000.00
Issuance Date: 05/08/2024
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/04/2024
Gravity: 1
Report ID: 0627700
Contest Date:
Final Order: 05/28/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/28/2024 | $3,000.00 | 06/04/2024 | Serious | |
Penalty | Z: Issued | 05/08/2024 | $4,839.00 | 06/04/2024 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used where run through holes in walls, ceilings, or floors: On November 9, 2023, and at times prior thereto, at the Crown Paint Company location in Oklahoma City, OK., employees on the production floor used a floor fan powered by a flexible cable that is ran through the ceiling, exposing employees to electrical hazards.