Violation Detail
Standard Cited: 19100421 G Pre-dive procedures.
Inspection Nr: 1519019.015
Citation: 01006
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,926.00
Current Penalty: $1,463.00
Issuance Date: 08/23/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 1032300
Contest Date: 09/16/2021
Final Order: 01/17/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2023 | $1,463.00 | Serious | ||
Penalty | C: Contested | 11/23/2021 | $2,926.00 | Serious | ||
Penalty | Z: Issued | 08/23/2021 | $2,926.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.421(g): The breathing gas supply system including reserve breathing gas supplies, masks, helmets, thermal protection, and bell handling mechanism (when appropriate) were not inspected prior to each dive. A) The employer was conducting dive operations in a geoduck tract 5 miles east of Port Angeles, Washington at a depth of 70 feet. They were using an airline system. The employer had no documentation of equipment inspection prior to any of the dives performed in this area.