Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1515367.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,827.00
Current Penalty: $5,500.00
Issuance Date: 06/08/2021
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/14/2021
Gravity: 5
Report ID: 0317700
Contest Date: 06/25/2021
Final Order: 05/31/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 05/31/2022 | $5,500.00 | 06/14/2021 | Serious | |
Penalty | C: Contested | 07/07/2021 | $6,827.00 | 06/14/2021 | Serious | |
Penalty | Z: Issued | 06/08/2021 | $6,827.00 | 06/14/2021 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy: a) Guard shack - The receptacle near the electrical panel did not have a face plate, exposing employees to shock hazards, on or about February 16, 2021. Abatement certification required.