Violation Detail
Standard Cited: 19100146 E01 Permit-required confined spaces
Inspection Nr: 1506366.015
Citation: 01006
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,059.00
Current Penalty: $11,059.00
Issuance Date: 05/28/2021
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/04/2021
Gravity: 10
Report ID: 0524200
Contest Date: 06/09/2021
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 06/11/2021 | $11,059.00 | 06/04/2021 | Serious | |
Penalty | Z: Issued | 05/28/2021 | $11,059.00 | 06/04/2021 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit: a) On or about December 1, 2020 through December 11, 2020, Kroeschell Engineering Co., Inc. did not prepare and complete and entry permit for steam vault SV1.4 on the Captain James A. Lovell Federal Health Care Center campus prior to entries made by Kroeschell Engineering Co., Inc. company employees removing and replacing a flexible expansion joint on a 12" high pressure steam line.