Violation Detail
Standard Cited: 19100272 G01 II Grain handling facilities.
Inspection Nr: 1505481.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $15,625.00
Issuance Date: 06/03/2021
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 06/25/2021
Gravity: 10
Report ID: 0523300
Contest Date: 06/23/2021
Final Order: 04/15/2024
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/15/2024 | $15,625.00 | 06/25/2021 | Serious | |
Penalty | C: Contested | 06/28/2021 | $13,653.00 | 06/25/2021 | Serious | |
Penalty | Z: Issued | 06/03/2021 | $13,653.00 | 06/25/2021 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.272(g)(1)(ii): All mechanical, electrical, hydraulic, and pneumatic equipment which presents a danger to employees inside grain storage structures shall be deenergized and shall be disconnected, locked-out and tagged, blocked-off, or otherwise prevented from operating by other equally effective means or methods: (a) On or about December 4, 2020, the bottom discharge auger for Silo 19 was running while one of the entrants, having entered for cleaning and inspection activities, stood in a location in the silo capable of resulting in engulfment in the event of grain movement.