Violation Detail
Standard Cited: 19260454 B Training requirements.
Inspection Nr: 1479006.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $5,000.00
Issuance Date: 09/29/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/02/2020
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 10/21/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/21/2020 | $5,000.00 | 11/02/2020 | Serious | |
Penalty | Z: Issued | 09/29/2020 | $9,446.00 | 11/02/2020 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) On or about June 12, 2020, the employees were not trained to recognize and eliminate the hazards associated with erecting, disassembling, moving, operating, repairing, maintaining or inspection the wire rope suspension scaffolding systems provided by the employer.