Violation Detail
Standard Cited: 19260453 B02 VII Aerial lifts.
Inspection Nr: 1462563.015
Citation: 01006
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,048.00
Current Penalty: $2,024.00
Issuance Date: 08/07/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0216000
Contest Date: 09/17/2020
Final Order: 04/26/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 04/19/2022 | $4,048.00 | Serious | ||
Penalty | F: Formal Settlement | 04/26/2021 | $2,024.00 | Serious | ||
Penalty | Z: Issued | 08/07/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.453(b)(2)(vii): Wheel chocks shall be installed before using an aerial lift on an incline, provided they can be safely installed: Location: 164 Union Ave New Rochelle NY 10801 a) On or about February 12, 2020, four employees were using an aerial lift daily for two months at an incline without wheel chocks.