Violation Detail
Standard Cited: 19100243 B02 Guarding of portable powered tools.
Inspection Nr: 1434719.015
Citation: 01006
Citation Type: Serious
Abatement Date: 04/10/2020 2
Initial Penalty: $5,783.00
Current Penalty: $4,048.10
Issuance Date: 03/20/2020
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 1
Report ID: 0729300
Contest Date:
Final Order: 04/02/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/02/2020 | $4,048.10 | 04/10/2020 | Serious | |
Penalty | Z: Issued | 03/20/2020 | $5,783.00 | 04/10/2020 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.243(b)(2): Airhose and hose connections used for conducting compressed air to utilization equipment was not designed for the pressure and service to which they were subjected: The employer is failing to prevent employee exposure to hazardous release of compressed shop air and flying debris. On or about October 1, 2019, the following conditions were present. a. Screw type hose clamps were used for connecting the airline to the spin machine. b. Airline to the spin machine was damaged in two areas; outer insulation was split. Abatement documentation is required for this violations.