Violation Detail
Standard Cited: 19261153 G01
This violation item has been deleted.
Inspection Nr: 1418218.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,747.00
Current Penalty: $0.00
Issuance Date: 01/17/2020
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 03/04/2020
Gravity: 5
Report ID: 0213600
Contest Date: 02/18/2020
Final Order: 08/10/2022
Related Event Code (REC): C
Emphasis:
Substance: S103
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/10/2022 | $0.00 | 03/04/2020 | Serious | |
Penalty | C: Contested | 02/25/2020 | $6,747.00 | 03/04/2020 | Serious | |
Penalty | Z: Issued | 01/17/2020 | $6,747.00 | 03/04/2020 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.1153(g)(1): The employer did not establish and implement a written exposure control plan that contained at least the following elements: (i) A description of the tasks in the workplace that involve exposure to respirable crystalline silica; (ii) A description of the engineering controls, work practices, and respiratory protection used to limit employee exposure to respirable crystalline silica for each task; (iii) A description of the housekeeping measures used to limit employee exposure to respirable crystalline silica; and (iv) A description of the procedures used to restrict access to work areas, when necessary, to minimize the number of employees exposed to respirable crystalline silica and their level of exposure, including exposures generated by other employers or sole proprietors. a) Thurston Road, Rochester, NY - On or about, and prior to 7/23/19, the employer did not establish and implement a written exposure control plan which contained the elements required in 1926.1153(g)(1)(I) through (iv). Employees dry swept and shoveled debris containing respirable crystalline silica from the floors and performed demolition activities used demo saws to cut and break speed block, concrete block, and clay tiles containing crystalline silica. ABATEMENT CERTIFICATION REQUIRED