Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1411622.015
Citation: 01006
Citation Type: Serious
Abatement Status: Not Completed - Employer Out of Business
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 12/19/2019
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 02/07/2020
Gravity: 10
Report ID: 0317000
Contest Date: 01/06/2020
Final Order: 01/04/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/04/2021 | $13,260.00 | 02/07/2020 | Serious | |
| Penalty | C: Contested | 01/14/2020 | $13,260.00 | 02/07/2020 | Serious | |
| Penalty | Z: Issued | 12/19/2019 | $13,260.00 | 02/07/2020 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment: a) Philadelphia Energy Solutions Refinery Complex, 3144 Passyunk Ave, Philadelphia, PA 19145 - HF Alkylation Unit 433: On or about June 21, 2019, the employer failed to establish/develop mechanical integrity procedures that included information on the extent and type of positive material identification (PMI) that was required to ensure that the conduct of retroactive positive material identification (retro-PMI) inspections/testing on PSM-covered process equipment at the PES refinery, including but not limited to, piping in the 433 Hydrofluoric Alkylation Unit, to maintain the integrity of process equipment in the unit. Employees working on and in the vicinity of equipment containing highly hazardous chemicals are exposed to fire, explosion, toxics, and corrosives hazards. b) Philadelphia Energy Solutions Refinery Complex, 3144 Passyunk Ave, Philadelphia, PA 19145 - HF Alkylation Unit 433: On or about June 21, 2019, the employer failed to implement its mechanical integrity procedures, Piping Inspection Procedure, PES-PH-INP-PRO-PRP-01.04, Appendix V, and Inspection of Process Piping Requirements, M.04.005 (Revision 10/20/2015), Section 5.4.2.b, when it failed to correctly identify a piping dead leg (e.g., spare pump piping on the discharge of the Depropanizer Reflux Pump P-14B) in the 433 Hydrofluoric Alkylation Unit. The incorrectly identified dead leg piping segment included an 8-inch piping elbow that catastrophically failed on June 21, 2019. Employees working on and in the vicinity of equipment containing highly hazardous chemicals are exposed to fire, explosion, toxics, and corrosives hazards.