Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1391558.015
Citation: 01006
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,335.00
Current Penalty: $5,020.20
Issuance Date: 06/28/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 07/23/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/23/2019 | $5,020.20 | Serious | ||
Penalty | Z: Issued | 06/28/2019 | $8,335.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.219(f)(3): Sprocket wheels and chains, which were seven feet or less from the floor or platform, were not enclosed: (a) On or about April 5, 2019; employee(s) loading blocks of foam onto the feed conveyors of the Baumer OFS VEQ line were exposed to a caught-in hazard in that the end cover was left off of feed conveyor number 3 and the drive chain and sprockets were not enclosed.