Violation Detail
Standard Cited: 19261205 A
Inspection Nr: 1320667.015
Citation: 01006
Citation Type: Serious
Abatement Date: 12/12/2018 2
Initial Penalty: $9,054.00
Current Penalty: $8,149.00
Issuance Date: 11/30/2018
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 12/21/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/21/2018 | $8,149.00 | 12/12/2018 | Serious | |
Penalty | Z: Issued | 11/30/2018 | $9,054.00 | 12/12/2018 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.1205(a): 29 CFR 1926.1205(a): Before entry was authorized, the employer did not document the completion of measures required by paragraph 1926.1204(c) of this standard by preparing an entry permit: a) At the construction site located at NW 8th Terrace & NW 13th Ave., Cape Coral, FL, an entry permit was not prepared before an employee entered a non-active sewer manhole system to conduct an air pressure test to a 500 foot long, 8 inch pipeline, on or about June 1, 2018.