Violation Detail
Standard Cited: 19260552 C07 Material hoists, personnel hoists, and elevators.
Inspection Nr: 1299920.015
Citation: 01006
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $8,315.00
Current Penalty: $6,652.00
Issuance Date: 06/22/2018
Nr Instances: 3
Nr Exposed: 3
Abatement Date:
Gravity:
Report ID: 0214500
Contest Date: 07/27/2018
Final Order: 03/11/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 10/28/2019 | $8,315.00 | Serious | ||
Penalty | F: Formal Settlement | 03/11/2019 | $6,652.00 | Other | ||
Penalty | Z: Issued | 06/22/2018 | $8,315.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.552(c)(7): Overhead protective covering of 2-inch planking, 3/4-inch plywood or other solid material or equivalent strength shall be provided on the top of every personnel hoist. a) Interior of Building - HEK Personnel Hoist: Employees were exposed to struck by hazards while utilizing a personnel hoist without overhead solid and strong protective covering, on or about 2/9/18 b) Interior of Building - HEK Personnel Hoist: Employees were exposed to struck by hazards while utilizing a personnel hoist without overhead solid and strong protective covering, on or about 2/12/18 c) Interior of Building - HEK Personnel Hoist: Employees were exposed to struck by hazards while utilizing a personnel hoist without overhead solid and strong protective covering, on or about 3/16/18