Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1164052.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,482.00
Current Penalty: $3,747.00
Issuance Date: 10/28/2016
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 11/07/2017
Gravity: 5
Report ID: 0213100
Contest Date: 11/09/2016
Final Order: 10/23/2017
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/23/2017 | $3,747.00 | 11/07/2017 | Serious | |
Penalty | C: Contested | 11/30/2016 | $7,482.00 | 11/07/2016 | Serious | |
Penalty | Z: Issued | 10/28/2016 | $7,482.00 | 11/07/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. a) Mill building - On July 26, 2016, or at times prior the power cord for the drill press was spliced only with wire connectors.