Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1159065.015
Citation: 01006
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,057.00
Current Penalty: $3,028.50
Issuance Date: 12/22/2016
Nr Instances: 2
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 01/13/2017
Related Event Code (REC):
Emphasis:
Substance: 8870
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/13/2017 | $3,028.50 | Serious | ||
Penalty | Z: Issued | 12/22/2016 | $6,057.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: The wet end section of the facility at 238 Nonotuck Street Florence, MA: On or about June 30, 2016, the cable tray and control panel for the Wet End reactor temperature control system and Formaldehyde pump select control panels contained openings where electrical knockouts had been removed and not replaced.