Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1147532.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,236.00
Current Penalty: $6,236.00
Issuance Date: 10/27/2016
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 11/23/2016
Gravity: 5
Report ID: 0213900
Contest Date: 11/16/2016
Final Order: 08/26/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 08/26/2021 | $6,236.00 | 11/23/2016 | Serious | |
| Penalty | C: Contested | 01/31/2017 | $6,236.00 | 11/23/2016 | Serious | |
| Penalty | Z: Issued | 10/27/2016 | $6,236.00 | 11/23/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employees were not instructed in the purpose and use of the energy control procedure: a) Mill department: Affected employees working in the facility as mill operators where equipment is serviced and maintained, such as, but not limited to calendars, were not provided training on the purpose and use of the energy control procedures, on or about 5/16/16. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.