Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1145009.015
Citation: 01006
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,500.00
Current Penalty: $2,000.00
Issuance Date: 06/01/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 07/01/2016
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2016 | $2,000.00 | Serious | ||
| Penalty | Z: Issued | 06/01/2016 | $3,500.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.219(c)(4)(i): Projecting shaft ends shall present a smooth edge and end and shall not project more than one-half the diameter of the shaft unless guarded by nonrotating caps or safety sleeves: WORKSHOP: The horizontal shaft ends and nuts of the Baldor buffers were unguarded. ABATED DURING THE INSPECTION
Translate