Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1117954.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $900.00
Issuance Date: 07/07/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/02/2016
Gravity: 5
Report ID: 0418400
Contest Date: 08/08/2016
Final Order: 09/21/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/21/2017 | $900.00 | 08/02/2016 | Serious | |
Penalty | C: Contested | 09/07/2016 | $2,000.00 | 08/02/2016 | Serious | |
Penalty | Z: Issued | 07/07/2016 | $2,000.00 | 08/02/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Foundry #1, on or about and at times preceding to March 30, 2016, specific procedures had not been developed for equipment including but not limited to: troubleshooting Pangborn shot blaster to control hazardous energy.