Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 1086093.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,850.00
Current Penalty: $3,465.00
Issuance Date: 02/11/2016
Nr Instances: 3
Nr Exposed: 6
Abatement Date: 02/24/2016
Gravity: 5
Report ID: 0215800
Contest Date:
Final Order: 03/07/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/07/2016 | $3,465.00 | 02/24/2016 | Serious | |
Penalty | Z: Issued | 02/11/2016 | $3,850.00 | 02/24/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) On or about 8/18/2015, Extruder Area: An extension cord being used to power a sump pump had damaged insulation. b) On or about 8/18/2015, Production Area: An extension cord being used to power a portable welder had damaged insulation. c) On or about 8/18/2015, Production Area: The power cord for a portable welder had damaged insulation. Abatement documentation is required for this item.