Violation Detail
Standard Cited: 19100119 F01 I G Process safety management of highly hazardous chemicals.
Inspection Nr: 1082421.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $3,000.00
Issuance Date: 02/04/2016
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 03/26/2016
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 02/25/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/25/2016 | $3,000.00 | 03/26/2016 | Serious | |
Penalty | Z: Issued | 02/04/2016 | $4,900.00 | 02/26/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(f)(1)(i)(G): The employer's written operating procedures covering the steps for each operating phase did not address startup following an emergency shutdown: a) Establishment - PEEB The employer did not write operating procedures for startup after an emergency shutdown or interruption of the PEEB process, where ethyl chloride and/or product remain in the process equipment following the shutdown. The existing written start up procedure assumes the process equipment is empty. Violation occurred on or about 8/4/2015.